I finally have the luge back.. as you may notice looking a little different. i figured if i'm not fast i might as well look good.. so a nice bit of powder coat will fix that. i can't say as much for the rider though.. 
Picture
Now comes the long task of putting it all back together. i know it won't be the last time i pull it apart and rebuild it.
Picture
once i have everything back together i will resume testing 
Picture
More to come soon-ish.

1 Comment

And then i realized i'm the fastest in the Southern Hemisphere.

7/9/2016

0 Comments

 
It's been a very long time coming so here it is
0 Comments

Wires it always me?

7/5/2016

0 Comments

 
So now i have a rolling board together it's time to wire it up and make it a powered streetluge or and actual jetluge.
First thing first. if you get bored easily you might as well cut to the end. if not i'll try to keep it brief for you anyhow.

The first thing i had to do was get a throttle control setup for the board. so i ran down to the local electronics shop and purchased a bunch of different size potentiometers. i hate electronics and for the most part it always confuses me. so i tend to take a boring long time to work out and map a plan of attack. 
Picture
This is my throttle control unit. i got it for like $3:00AUD off the ebays. the wires going into it are my doing. normally it has a tiny potentiometer sitting there. but it was made of plastic and would not be suitable for my needs. so it had to go and i needed a replacement. so...
Picture
This is the most pains taking part. soldering. i'm not a patient man a lot of the time. but i have learnt patients, and in doing so i have managed to find pleasure in some of the most tedious tasks. i have found i do love customising anything i own. once the wires were connected. it was time to see if everything was still working, hoping that i didn't cook any of the electronics. not everyone has and extra $3:00 laying around if i stuffed it up you know!
Once i knew that the throttle worked all i had to do was program the computer so the turbine would know what the hell i wanted it to do.
Now that everything was calibrated i had to do a test. this meant running the board. i was very excited and nervous for this part. my history with turbines has not been the best but as if i was going to let that stop me. below is the very first start of the jet luge in it's basic lay out. nothing mounted to it's final location except the turbine.
0 Comments

Time to piece things together.

7/5/2016

0 Comments

 
One of the best things about working monday to friday is that it takes your mind off the steps between what you are really working for. i love my job more than any job i have ever had. but i work so i can follow my dreams and enjoy life with those around me. 
This weekend the final piece arrived to get the board put together. i still have a long way to go but i can finally see if everything i have designed will fit together. 
​​Lucky number 7. Seven pieces is all it takes to have your very own jet luge. sure i could have used less. but i have always liked the number seven.
Picture
Below is the layout of everything how it needs to sit. nothing is screwed in or on. i just wanted to quickly see that everything was ok.
Picture
Picture
Picture
One of the first things i had to do was work out where and how i wanted to mount the tank to the chassis. i had a pretty good idea of what i wanted to do in my head before hand. I just needed to see that it would work in the real world. to do this i used some pieces i had laying around to mock up the position of where the tank will sit on the board.  
Picture
With the tak sitting nicely i had to make sure anything i used to mount it would not impede on any of the electronics or battery. this is the slowest part. you lay it out. see a possible problem. lay it out again. see something else. stare at it for like an hour or two. go away come back and stare some more. once you drill that hole or make that cut. it's there for life. Like any good tattoo. i will always take as long as is needed.
Picture
Once i was sure of the layout. i could now start to hard mount everything needed to make the rolling chassis.. 
Picture
Picture
I am now the owner of possibly the longest and most stupid looking streetluge/longboard in the world. next comes all the fun of wiring this sucker up to make the silly become cool. 
0 Comments

Fill'er Up Thanks.

6/29/2016

0 Comments

 
One of the most exciting moment in my life was receiving my new turbine. knowing i can finally get back to focusing on trying to break the landspeed record again and building the board to do it. the second most exciting thing was getting pictures of my nearly completed fuel tank on my birthday. below i will run you through the pictures and my design to give you a little understanding as to what i want to achieve with the board.
Picture
the is what we have been calling the tower. the turbine will sit at the very top. the bottom with the pipe will be the top of the fuel tank. the pipe will run through the tank and carry my electronics and fuel lines to the turbine.
i wanted to the turbine to sit in the wind to offer best intake with minimal turbulence with a hope it will give me access to most of its power. 
Picture
This is how the tank will look in completion. you can see in the top of the cradle where the fuel lines and electronics will meet the turbine. the two smaller holes at the rear are the breathers for the fuel tank. the F is for fun.
Picture
Only decision now is where do we put the fuel cap. you may note the overhang of alloy at the back of the fuel tank. this will be to lay out the electronics and fuel pump and computer. not sure how much space i'll need yet so we allowed enough to be able to cut it back later. 
Picture
While this position make for easier refueling and convenience. it does look bloody stupid. it wasn't till i saw the next photo i knew where it had to go.
Picture
The moment i saw this image i knew what i had to do. but how to get the fuel cap behind the tower and still be able to access it? easy!
You can also see the little fuel pickup pitot tube just below the fuel cap in this photo. for such a small tube this turbine apparently drinks allot of fuel. hence the tank size. when complete should be between 2.5 to 3 liters.
Picture
Nothing a bit of 2 inch alloy pipe can't fix and a 45% cut. this will be how everything mounts. now to just have it all welded up and we can get to fitting it on the board. 
0 Comments

Tank you  very much!

6/29/2016

0 Comments

 
And just like that it was done. finally a completed fuel tank for the jet luge.
Now it's time to get it back and mate it with the board. hopefully my measurements were correct and it will just slide together. Once i get it all mocked up i will start wiring to work out the layout for how things will go. i'm sure i'll be doing this more than just a couple of times. 
0 Comments

I  GOT A SPINE!

6/23/2016

0 Comments

 
It's great to know after a long day's work you can come home to something you love.......and after spending time with my partner, i can go and play with the jet luge. i got word today that my spine and rear riser for the jet luge has been all welded up and is ready to go. that means i can finally put the rolling board together. the next thing i need done is the fuel tank. which should be done any time soon....ish. 

I gotta thank Hannah over at DIY Garage in Rutherford for the great work and speedy turnaround time on the welding. they have their grand opening on 9th of July. go say hi.
Picture
0 Comments

I Gotta Get Control!

6/15/2016

0 Comments

 
With the wheels of progress turning i continue to build and modify the new jet luge cannibalising part of the old. In this case, i refer to the forward controls. After the catastrophic failure of the last luge and with all the work put into it i couldn't bare to see it just sit there (don't worry i have plans for it also) Removing the forward controls i then had to mount them on the new board. it was rather straightforward considering i tend to use the same template for most of my boards. the hard part was the wiring. since the wiring for the new jet luge didn't correspond with the old boards setup.. the last setup was run on a 12v system. this new setup runs at 7.4v. this meant replacing the old potentiometer and replacing it with a compatible one.. A potentiometer is the (how fast do you want to go) bit of the the board. in this case very! ​you'll see the modifications and mounting of the forward controls in the pictures below.
In this video i had just calibrated the throttle to the computer. this was not an easy task as the system was setup for more radio controls then highly modified streetlugers. 
Picture
The next thing I had to do once it was rewired and roughly calibrated was get the thing mounted. The screw to the right of frame is to mount the return spring for the throttle. The second thing once i mounted it. i found i was not able to trim up and down properly and this would result in premature engine shut off. i need to get more throttle. the only way to do that was to shave down the original trim nut. This worked out well as i now had a very sturdy stop for when i reached full throttle. 
Picture
With the original trim nut now practically gone i was now forced to put the new trim nut underneath. this worked out extremely well as it actually allowed for more accuracy whilst trimming up and down.
Picture
New pod modified wired and mounted. All set with a grub screw for a bit of security. the little black unit you see with the wires running to it was originally a servo tester i got off the internet. i modified it to run the new potentiometer. once all in place you will not see any of this wiring and most of it will be mounted and tucked away inside the center of the board. 
All working smoothly as you can see. this will be the setup for initial testing. i may refine whats been done but for the time been it seems to work just fine.
0 Comments

GET A SPINE!!!

6/8/2016

0 Comments

 
​Now that i have the turbine, i can begin building. if you're counting, this will be. luge number 3. This board i want to keep as basic and simple as possible. i want it to stay as close to a competition board as i can. To do that, i have decided to take one of my best built boards and pull it apart. Just so i can build it back up again longer and hopefully faster.
Picture
You will see in the photo above i will be extending the spine.. In doing this i will need to reinforcing the rail and doubling up on the channel to compensate for the extra length and weight. i will keep a bit of flex in the board for this one.. just a bit to keep things a little smoother over joints in the road and the odd stone on the track.
Picture
In the picture above you will see the markings i have made for the welder. i can't weld at home so i do this to avoid any confusion when i send it out.  Match the lines on side A and side B and then weld. that simple.
Picture
In this picture you can see the full length the new board will be. The 4 holes in the middle of the spine will match up with the holes in the pan next to it. the overhang at the rear will then run down to the riser with the turbine sitting in the middle.. i use T6 aluminum C channel for the spine and 6064 alloy for the pan. This is the same alloy i use in my race boards.   
0 Comments

This just in!

6/5/2016

0 Comments

 
After a very very long wait. I have been putting every penny i could spare aside. Finally the beautiful shiny has arrived. I have been keeping it quiet. But this is what i have been saving for. My new turbine. Ready to mount and roll. Keep an eye on this blog as i have to build a new board from scratch for this turbine to go in.
Picture
0 Comments
<<Previous
    Picture

    Partners:

    Picture
    Picture
    Picture

    Supporters:

    Picture
    Picture
    Picture
    Picture

    Archives

    August 2016
    July 2016
    June 2016
    September 2015
    July 2015
    June 2015
    June 2014
    May 2014
    March 2014
    November 2013
    October 2013
    September 2013
    August 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    December 2012
    November 2012
    October 2012
    September 2012
    August 2012
    July 2012
    June 2012
    May 2012
    February 2012
    January 2012
    December 2011
    November 2011

    Categories

    All
    Doge
    Dogecoin
    Downhill
    Guinness
    Jet
    Jet Powered Luge
    Jet Skateboard
    Landspeed
    Land Speed
    Longboard
    Reddit
    Skateboard
    Skate Board
    Turbine Powered

    RSS Feed

www.jetluge.com.au / CONTACT

© Copyright JetLuge.com.au 2009-2016. All rights reserved.