Well we may not be rolling but we just maybe running at any minute. i thought i would share with you the latest photos of the jet luge in it's current state. there is still allot of work to be done but all the major stuff is over and done with. soon i will have it wired up and i will be test firing the engines. you may notice that the fuel tank is now completed and ready for filling. I am very happy to say i am just 3cm within the 60cm width allowance for the entire width of my luge to be eligible for the Guinness world record books. this leave me with a whole centimeter and half on either side to play with. i'm so excited i not sure what i should do with all the space. suggestions anyone? You can fit your entire fist into the afterburners. that is if you want to pull back a cigarette stub of an arm in less than a second. You can see the symmetry in engines A and B. it is a beautiful sight. i now just have to get some heat strapping in and they will be complete. Top dead center. you can see where my head will rest in between the starter motors at the front of the turbines. little known fact is that about 70% of the noise produced from a turbine is produced from the front compressor. i need a ear plug sponsor i think haha.
If you have any question at all or if i have missed anything feel free to ask me. And don't forget to click the like button below. thanks for dropping in. Leave a Reply. |
Partners:
Supporters:
Archives
August 2016
Categories
All
|
www.jetluge.com.au / CONTACT |
© Copyright JetLuge.com.au 2009-2016. All rights reserved.
|